Instructions, LT Supply, LTCT, Service Connection, TNERC

TNERC amendments to the TNE Supply and Distribution Codes in respect of enhancement of load limit from 112 kW to 150 kW under LTCT connections


Click the below link to download Orders:-

👉 Memo No.CE/Comml/SE/Comml/EE3/AEE3/F.CRP/ FLM-CM/107/2020, dt.07.09.2020

Click the below link to download Orders:-

👉 Enhancement of load limit from 112 kW to 150 kW under LTCT connections TNERC amendments

Leave a comment