Solar, TNERC

Tamil Nadu Solar Energy Policy-2019 – Order on Rooftop Solar Generation by the TNERC – Implementation of Solar net feed-in connection – Modification of working instruction – Reg.

The consumers under the solar net feed-in scheme will have to install two meters, one is for measuring solar power generation and the other is to measure import and export of energy. However the installation of solar generation meter may not be insisted on for all categories of consumers until further instruction. The first meter, solar generation meter shall be placed after the invertor at the ground floor of the premises to facilitate easy access for meter reading. The second meter shall be a bi-directional meter which will replace the existing consumer meter (single phase or three phase) for commercial settlement of energy imported and exported. The first and the second meter will have to be installed at the same location where existing meter for recording consumption of energy is installed. The meters shall adhere to the standards specified by the Central Electricity Authority (Installation and Operation of Meters) Regulation, 2006 and as amended from time to time and Commission’s relevant regulations/orders as amended from time to time. TANGEDCO will procure, test and install the meters. The cost of new/additional meters for the net feed-in scheme and the installation and testing charges shall be borne by the consumers.

Click the below link to download Orders:-

👉 Memo.No.CE/Comml/SE/EE/R&C/AEE1/F.Solar NFI/D.118/19,dt.21.05.2019

Leave a comment